Temporary flooring options
If you’re faced with an uneven ground surface and don’t want to go to the expense of having a permanent base laid for a temporary solution, there are a number of temporary flooring options.
The budget option is to have a plastic portable floor (similar to those used at festivals and events to create pathways), which simply lays to your existing surface like this one which was installed at the temporary cruise line baggage hall at Liverpool.
This system works well on level surfaces and is capable of withstanding 2.5tonne forklift trucks. It’s also very quick to install and relatively cheap to hire.
The biggest downside with this type of floor is it can lift in extreme heat (which we don’t get a lot of in the UK) and of course, if you get any water ingress due to sloping ground, the water will run across the top of the portable floor.
A better option can be a ‘heavy-floor’ system which is designed to level the ground and has the added benefit of acting as the base for the temporary building, so there is no need to penetrate the ground to anchor the building into place.
The image above, shows a temporary building installed on top of a ‘heavy-floor’ on a grassed area.
These are used extensively when temporary buildings are supplied to power stations and oil refineries when they are used as site workshops and offices.
It can also be used for car show rooms and retail areas as seen here, at a temporary Pret-A-Manger coffee lounge.
The best feature of this floor is that as it is a sub-structure system, it lifts the entire building off the existing ground surface, so any water runs underneath and it guarantees a level surface.
It is limited in its weight baring capacity to 500kg’s m² so it is not feasible to use it for fork lift trucks or heavy palletised goods.
It is possible to run a pump truck across it, so providing fork lift access is not needed, this floor system is a very fast and effective way to create a solid level base, when the existing ground surface is either too uneven or there is only a grassed or hardcore area.
In some situations a raised concrete base might be better, but if the intention is only to use the temporary building for a few months, as opposed to years, then a new concrete base would probably be cost prohibitive.
Author bio: Sophia writes for Smart Space, Britain’s leading specialist in flexible building solutions since 1985.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
About the 5 Percent Club and its members
The 5% Club; a dynamic movement of employers committed to building and developing the workforce.
New Homes in New Ways at the Building Centre
Accelerating the supply of new homes with MMC.
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.